August 2021 – A Sturdy Foundation

A sturdy foundation is the beginning to many great things. The footings for the new additions were completed and slabs were poured, giving our new footprint a great start! At this stage, the new bar and offices/storage didn’t look like much, but these are crucial steps to the process. During this stage the openings in the existing building were also made for the two additions. The vision that has been in the works for almost a year is turning tangible.
July 2021 – Move to Temporary Structures and Indoor Demolition

Our indoor operations have officially moved over to the temporary structures located to the East and West of the building. This includes our Golf Shop, offices, and food operation. With all operations moving out of the building, it was time for the indoor demolition to begin! Now that the walls are down and the ceiling opened up, the space is starting to take on a new life and foreshadow what the future holds!
June 2021 – Club House Construction Begins!

Construction is starting at the club house! At the time, we were still operating out of the Golf Shop while we got our temporary structures ready. The entire back of the building was closed off with fencing to begin exterior demolition so patrons were advised to use the front entrance at that time. Concrete, trees, and brick work were all removed from the back of the existing structure to make way for what’s to come!
May 2021 – Cart Paths

The first project to break ground on this renovation was our Cart Path Project! Up until now, the paths had been original to the course, and although they were good to us over the years, it really showed! We were pleased to be able to host golfers throughout the duration of this project. This is the only project we foresee disrupting the play of the course, and look forward to many seasons to come on this updated path!